by lafargeexshaw | Aug 5, 2020 | Plant News, Uncategorized
On August 5, 2020 we conducted a scheduled blast inside the South East Ridgeline of the quarry. The blast was scheduled for 2:30 p.m., however, the blast was slightly delayed. The blast siren was activated at approximately 2:50 p.m. and the blast was fired at 2:51...